Bumps vendored Oban Pro from 1.6.13 to 1.7.0, which transitively bumps oban core to 2.22.1 (requires migrations v14) and db_connection to 2.10.0. - mix.exs constraint: ~> 1.6 → ~> 1.7 - vendor/oban_pro/ replaced with v1.7.0 hex package - migration 20260430142200: Oban core v12 → v14 (must run first) - migration 20260430142241: Oban Pro 1.7.0 schema additions Also corrects a pre-existing constraint name in AgentAssignment that was left stale by the equipment→devices rename migration (20260117190134). The unique index is named agent_assignments_device_id_index, but the schema's unique_constraint/3 still pointed at the old equipment_id name, causing the test suite to surface Ecto.ConstraintError instead of a changeset error. Required to get the suite green for this upgrade.
6 lines
175 B
Elixir
6 lines
175 B
Elixir
defmodule Towerops.Repo.Migrations.UpgradeObanToV14 do
|
|
use Ecto.Migration
|
|
|
|
def up, do: Oban.Migration.up(version: 14)
|
|
def down, do: Oban.Migration.down(version: 12)
|
|
end
|