prop/lib
Graham McIntire 06feda7110
perf: finish audit follow-ups (path conditions, recalibrator parallelism)
Path calculator conditions map was missing :latitude and
:best_duct_band_ghz. Scorer read them with bracket-notation so the
behaviour was defensively correct but we were leaving signal on the
floor:

- latitude: midpoint of src/dst so `score_season` picks up the right
  latitude-based seasonal shift for northern vs southern paths
- best_duct_band_ghz: queried via new Weather.nearest_native_duct_ghz/3
  at the midpoint so score_refractivity/4 applies the 1.15× boost
  when a native-resolution duct supports the target band

Recalibrator.fit/1 was serialising ~10k per-contact HRRR lookups
(5000 positives + 5000 negatives, one Weather.find_nearest_hrrr each).
Parallelised both sides with Task.async_stream at 20 concurrency —
well under the prod db pool of 30. Cuts a band recalibration from
~minutes of query round-trips to seconds.
2026-04-18 12:23:18 -05:00
..
microwaveprop perf: finish audit follow-ups (path conditions, recalibrator parallelism) 2026-04-18 12:23:18 -05:00
microwaveprop_web perf: finish audit follow-ups (path conditions, recalibrator parallelism) 2026-04-18 12:23:18 -05:00
mix/tasks feat(rainscatter): classify QSO propagation mechanism from common-volume radar 2026-04-17 15:57:59 -05:00
microwaveprop.ex initial 2026-03-28 11:28:47 -05:00
microwaveprop_web.ex Merge auth links into main nav and lower password min to 8 2026-04-08 10:39:51 -05:00