Commit graph

3 commits

Author SHA1 Message Date
7fb340bc35 Fix all remaining credo --strict issues (0 issues)
Aliases: add module aliases for 9 nested module references
Apply: replace apply/3 with direct module attribute calls
Line length: break 1 long spec line
Refactoring: extract helpers to reduce complexity and nesting
in show.ex, radio.ex, weather workers, terrain, duct detection,
backfill dashboard, contact map, and mix tasks
2026-04-12 10:26:53 -05:00
e7a7ae073d Phase 9.3, 9.4, and Phase 3 NEXRAD pipeline
Task 9.3 - Weight recalibration via gradient descent:
- Recalibrator module fits logistic regression weights using Nx
- Trains on QSO positives vs random baseline negatives
- Cross-validates by month, normalizes weights to sum to 1.0
- Mix task: mix recalibrate_scorer --sample 5000 --epochs 2000

Task 9.4 - Side-by-side scorer comparison:
- ScorerDiff.compare/3 re-scores grid with old vs new weights
- Reports mean diff, regressions, improvements, per-band breakdown
- Mix task: mix scorer_diff --new-weights '{...}'

Phase 3 - NEXRAD ingestion pipeline:
- NexradClient fetches IEM n0q composite PNGs, extracts per-point
  box statistics (mean/max dBZ, texture variance)
- NexradObservation schema with unique (lat, lon, observed_at)
- NexradWorker on :nexrad queue for background processing
- nexrad_texture backtest feature in Features module
- mix nexrad_backfill --limit 200

All tasks added to AdminTaskWorker and Release for production use.
1116 tests, 0 failures.
2026-04-10 12:48:36 -05:00
01909dbe66 Run admin tasks as Oban jobs instead of blocking eval
Release.backtest_all, climatology, native_derive now enqueue an
AdminTaskWorker job on the new :admin queue and return immediately.
Progress visible in Oban Web at /admin/oban.
2026-04-10 12:26:01 -05:00