Commit graph

1 commit

Author SHA1 Message Date
f40e88e305
docs: plan for GFS-driven extended-horizon forecasts (18 h → 240 h)
HRRR caps at f018, so beyond ~18 hours the map and path calculator
go blank. This plan scopes a GFS open-data ingest that runs
alongside HRRR to drive the 18-240 hour forecast window, with a
visible seam on the timeline where the resolution drops from 3 km
to 0.25°.

Scope: GFS 0.25° CONUS subset from AWS S3, four runs/day on the
standard cycle, chained fetch/score workers that mirror the HRRR
pipeline shape, per-source binary score files so HRRR and GFS stay
independent. ECMWF IFS HRES listed as a follow-up once GFS works.
2026-04-18 12:35:08 -05:00