Commit graph

3 commits

Author SHA1 Message Date
b764034e46
test: push coverage to 78.6% — MapLayers 100%, LinkMargin 100%, Elevation 94%
- Weather.MapLayers: unit tests for all/0, default_id/0, valid_id?/1 (25→100%)
- Rover.LinkMargin: link_margin_db ScoresFile round-trip tests (57→100%)
- Rover.Elevation: SRTM tile file read path + void sentinel (44→94%)
- Pskr.Aggregator: pending_count, empty flush tests (65→74%)
- Buildings.MsFootprints: quadkey/bbox pure function tests (51→51%)
- Weather.Grib2.Wgrib2: property tests for parse_lon_val_segment (23→23%)
- test/support/data_case: File.rm_rf -> rm_rf to fix concurrent race
2026-05-07 13:17:40 -05:00
0f15e99fb9
feat(buildings): integrate MS footprints into path clearance + map render
Phase 2/3/5 of the building-blockage support:

* Parser streams csv.gz tiles into compact records (centroid, radius,
  height) — keeps RAM ~32 B per polygon, drops -1.0-height entries.
* Index buckets records into 0.01° (~1 km) grid cells in a public ETS
  table for concurrent reads; max_height_near/3 and records_near/3
  scan only the 9 nearest buckets.
* Loader lazily parses any cached quadkey before a Calculate so the
  scorer is terrain-only when tiles aren't on disk yet.
* Rover.PathTerrain now treats each path-sample obstacle as
  terrain_elev + max_local_building_height, so blocked LOS through
  recent construction actually reduces clearance.
* Selecting a candidate pushes a candidate_buildings event with the
  buildings near each rover→station path; the hook renders them as
  height-coloured circles (yellow <10 m, orange 10-30 m, red >=30 m)
  with a tooltip showing height in meters.
2026-04-26 10:44:46 -05:00
5a97776fd5
feat(buildings): MS Global ML Building Footprints quadkey + tile fetcher
Phase 1 of building-blockage support: implements quadkey math (Bing/MS
tile encoding), looks up the MS dataset-links index for UnitedStates,
and downloads csv.gz quadkey tiles to /data/buildings (overridable via
:buildings_cache_dir). Index is cached 24h; tiles are written once and
reused. No path-analysis wiring yet — that's the next slice.
2026-04-26 10:33:25 -05:00