HRDPS at 0.5° step previously dropped its lat=50 row inside HRRR's lon
range, so its first painted cell sat at lat=50.5 (halfStep=0.25 →
50.25°N). HRRR's top row at lat=50 paints to 50.0625°N. The ~0.19°
(~21 km) blank strip between them was visible on /weather wherever the
viewport crossed the US-Canada border.
Make in_conus_bbox exclusive on the north edge (lat < LAT_MAX) so the
boundary row stays in HRDPS. The merge_prefer_hrrr layer dedupes by
exact (lat, lon) on the merged read path, and the canvas overlay paints
HRRR above HRDPS, so the new overlap is invisible everywhere HRRR has
data.
Won't take effect on prod until the next HRDPS chain run produces fresh
chunk files.
The HRDPS pipeline as written was unusable in production: each chain
step took ~5 hours (not 30-90s as the dev-bench claim) because every
`wgrib2 -lon` batch redundantly JPEG2000-decodes ~150 records. With 57
batches × 18 forecast hours, a single cycle would take days to drain.
The /weather Canadian view only needs the current hour, so the cheapest
fix is to stop seeding the rest of the chain entirely:
* Rust grid: HRDPS_STEP=0.5 (was 0.125) drops point count 16× to ~3.5k.
Coarser cells than HRRR, but /weather gets visible Canadian coverage
inside one chain step (~20 min) instead of never.
* GridTaskEnqueuer.seed_current_hour/2 inserts exactly one forecast row
whose valid_time is closest to `now`. fh is clamped to 1..18 so the
Rust F00Reserved branch never fires.
* HrdpsGridWorker switches to seed_current_hour and drops the
6-hour-cycle cron in favor of HH:35 hourly fires. Reseeds are
idempotent on the 4-column unique key.
Also fixes a pre-existing credo "nested too deep" in
ScalarFile.read_point by extracting lookup_in_chunk + hit_or_false
helpers — happened to be on the read path that surfaces this work, so
folding it into the same commit.
CI runs cargo clippy with -D warnings. The yesterday's HRDPS commits
introduced two pedantic-but-blocked lints:
- grid.rs:97 in_conus_bbox used `>=`/`<=` chain — clippy's
manual_range_contains says use (LAT_MIN..=LAT_MAX).contains(&lat).
- pipeline.rs:426 backfill_dpt_from_depr iterated `cell.iter()` and
threw the values away — clippy's iter_kv_map says use
cell.keys().filter_map(...). Tightened the inline format strings
to `{depr_key}` instead of the deprecated `{}`-with-arg form to
avoid a follow-up useless_format complaint on the same touch.
cargo clippy --all-targets -- -D warnings passes; cargo test
--release stays at 158 passed.
Stages 4-5 of the HRDPS plan. Lands the Rust forecast-hour pipeline
for source='hrdps' grid_tasks rows.
What ships:
- `hrdps_fetcher.rs` — sibling of fetcher.rs for ECCC's MSC Datamart
shape: date-prefixed URLs, one variable per GRIB2 file, concurrent
fetch + byte-concat into a single multi-record blob. wgrib2 reads
multi-record files natively so the downstream decoder path is
unchanged. Mirrors lib/microwaveprop/weather/hrdps_client.ex.
- `grid::hrdps_only_points()` + `grid::hrdps_grid_spec()` — Canadian
cells (49-60°N, -141 to -52°W) minus the HRRR overlap. Disjoint
from conus_points by construction.
- `db::TaskSource` enum + `source` column on ClaimedTask. claim_next
surfaces source for forecast lane dispatch; claim_next_analysis
filters to source='hrrr' only (HRDPS analysis path is not yet
ported — would need native-duct + NEXRAD + commercial merges that
Rust doesn't have for HRDPS).
- `pipeline::run_chain_step_hrdps` — fetch combined blob, decode with
HRDPS grid spec, drop HRRR-overlap cells via a HashSet of
hrdps_only_points, back-fill DPT from DEPR (HRDPS publishes DEPR
as primary), score every band, write `<band>/<iso>.hrdps.prop`.
Skips per-valid_time profile + scalar artifacts since those would
clobber HRRR's at the same valid_time — surfacing HRDPS on /weather
is a separate stage.
- worker.rs dispatches forecast lane on (kind, source) — Hrrr →
run_chain_step, Hrdps → run_chain_step_hrdps. Analysis stays
HRRR-only. Worker constructs an HrdpsClient alongside HrrrClient.
- `scores_file::write_atomic_hrdps` writes to `.hrdps.prop` with the
Canadian grid spec via the new encode_with_spec. Coexists with the
HRRR `.prop` file for the same (band, valid_time).
163 unit tests pass; backfill_dpt_from_depr handles surface and
pressure-level levels with no double-fill when DPT exists.
Extracts the memory-hostile HRRR fetch → decode → score pipeline for
forecast hours 1–18 into a separate Rust service (`prop-grid-rs`).
Elixir retains f00 with its native-duct + NEXRAD + commercial-link
enrichment; Rust handles the other 18 steps per hourly chain.
Hand-off via a new `grid_tasks` table (`FOR UPDATE SKIP LOCKED` claim
from Rust, Postgrex `NOTIFY propagation_ready` back to Elixir). Rust
writes the same on-disk score-grid format Elixir already uses, to the
same `/data/scores` NFS tree. Phase 1 ships in shadow mode with
PROP_SCORES_DIR=/data/scores_shadow.
Rust crate layout at `rust/prop_grid_rs/` (1:1 module parity with the
Elixir source it ports):
- grid, region, band_config, scores_file, sounding_params
- scorer: all 10 factors + composite. Matches the Elixir scorer
byte-for-byte across 115 golden-fixture samples (5 scenarios
× 23 bands).
- decoder: wgrib2 subprocess + Fortran-record lola-binary parser
- fetcher: HRRR URL derivation + idx cache (1h TTL) + 8-way
parallel byte-range downloads with 429/5xx retry
- pipeline: end-to-end chain step, f00 rejected at the boundary
- db: sqlx grid_tasks claim/complete + propagation_ready NOTIFY
- bin/worker: tokio main loop, JSON logs, SIGTERM-safe
91 Rust tests + clippy -D warnings clean. 2,158 Elixir tests green.
Elixir additions:
- `GridTaskEnqueuer` seeds fh=1..18 rows from
`PropagationGridWorker.seed_chain/0`
- `NotifyListener` LISTEN → warm `ScoreCache` → PubSub fan-out
- `ShadowComparator` diffs prod vs shadow `.ntms` bodies
- `mix rust.golden` task writes the Rust-side golden fixture
k8s: new `deployment-grid-rs.yaml` pinned to talos5 (32 GB NUC) via
`prop-grid-rs=primary` nodeSelector + `workload=grid-rs:NoSchedule`
toleration, 512 Mi limit, sharing the existing NFS `/data` mount.
The plan document is at `plans/vivid-hatching-quail.md` (local to my
workstation); phases 2 (cutover) and 3 (talos5 concurrency tuning)
follow after 72h of shadow-mode parity.